Customization: | Available |
---|---|
After-sales Service: | Free Parts |
Rated Loading Capacity: | 260 Ton |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
EFFICIENT, QUICK AND SAFETY
The mechanism operating speed up 20%, and the speed of each mechanism don't slow down while operating 2 functions simultaneously;
Time of erecting the whole crane is less than 6 hours;
Omni-directional real-time LMI and monitoring system, to ensure safety operation.
CONVENIENT, COMFORTABLE AND INTELLIGENCE
The max. Single transport weight is 30.5t, transport width is 3m;
Omni-directional vehicle information platform, real time monitoring equipment operation, The IOT intelligent interaction system make the mobile service come true.
Full view cabin, buttons and switches are all within reach, all-around air conditioner form a comfortable operating space.
Item
|
Value
|
Remarks
|
|
Max. lifting capacity × Radiust × m
|
260×5
|
|
|
Deadweight with basic boomt
|
210
|
|
|
Main boom lengthm
|
20~83
|
|
|
Length of main boom with light boom headm
|
86~95
|
|
|
Fixed jib lengthm
|
12~30
|
|
|
Max. lifting capacity of fixed jibt
|
34
|
|
|
Offset angle of fixed jib°
|
10,30
|
|
|
Max. length of main boom with fixed jib m
|
77+30
|
|
|
Luffing jib lengthm
|
21~60
|
|
|
Max. lifting capacity of luffing jibt
|
73.5
|
|
|
Main boom angle under luffing jib working condition°
|
65,75,85
|
|
|
Max. length of main boom with luffing jib m
|
62+60
|
|
|
Max. speed of single rope on drum
|
Main winchm/min
|
110
|
The 6th rope layer
|
Auxiliary winchm/min
|
110
|
The 6th rope layer
|
|
Derricking winchm/min
|
29X2
|
The 6th rope layer
|
|
Luffing winchm/min
|
46
|
(Optional)
The 6th rope layer |
|
Gradeability%
|
30
|
|
|
Ground pressureMPa
|
0.115
|
|
|
Overall dimensions (L×W×H)m
|
10.2×7.6×3.3
|
Without mast and boom frame
|